Friday, 4 November 2016

504 - Design Production, A - Z in Content, Time Frame Actuality

Time Frame Actuality 

At the start of these brief a time frame guide was set, over the course of the project this has drastically been altered, this is due to the time taken to produce the outcome, unplanned issues like the need for a final re-print and redo of the final book.

Even thought this was alter this did give me a way to keep track of where i needed to be, if i was really behind it showed me where i had aims so i released i needed to do more work. It also kept track of when my print slots where, this was really useful as i kept forgetting so in the end i had to to also set an alarm for the print slot incase i forgot on the day.

Over the space of the module i have edited the time frame to fit wit issues and the progress so when is tart the next brief i can still see what needed doing and when for.

DON'T LEAVE THE BLOGGING AND THE DESIGN BARDS FOR THIS BRIEF TILL TH LAST MINUTE












No comments:

Post a Comment